Location Howolgok-dong, Seongbuk-gu, Seoul, Korea
Program Educational Research Facilities
Site area 271,714 ㎡
Building area 854.12 ㎡
Gross floor area 3,528.59 ㎡
Building scope B1 - 5F
Structure RC
Exterior finish Exposed concrete finish
Interior finish Gypsum board
Construction Yegong
Client KIST
Design period 2022.08 - 2023.05
Construction period 2023.9 - 2025.1
Collaboration design studio dohgam
Photographer Kyung Roh
Program Educational Research Facilities
Site area 271,714 ㎡
Building area 854.12 ㎡
Gross floor area 3,528.59 ㎡
Building scope B1 - 5F
Structure RC
Exterior finish Exposed concrete finish
Interior finish Gypsum board
Construction Yegong
Client KIST
Design period 2022.08 - 2023.05
Construction period 2023.9 - 2025.1
Collaboration design studio dohgam
Photographer Kyung Roh