Location   Howolgok-dong, Seongbuk-gu, Seoul, Korea
Program  Educational Research Facilities
Site area  271,714 ㎡
Building area  854.12 ㎡
Gross floor area  3,528.59 ㎡
Building  scope B1 - 5F
Structure  RC
Exterior finish  Exposed concrete finish
Interior finish  Gypsum board
Construction  Yegong
Client  KIST
Design period  2022.08 - 2023.05
Construction period  2023.9 - 2025.1
Collaboration  design studio dohgam
Photographer Kyung Roh